MUM (Multipurpose Underwater Machine) and Its Use in the 1915 Çanakkale Bridge Project, Published in E-mosty MagazineAras MarineRelated Posts 1915 Çanakkale Bridge Dry Dock Approach Channel Dredging Completed 0 31 May 2025 ARAS Started Scanning with THSD within the Scope of TANAP Project Trenching Works 0 ARAS Marine Construction in TANAP Project. A.Ş. Completed the Dredging Works 0 Ataman and Cengizhan at Haydarpaşa for Supply 0 Çanakkale 1915 Bridge Stone Embankment and Erosion Protection Works Contract Signed 0 TANAP Project Off-shore Contract Signed 0 ARAS Adds New Offshore Operations Support Vessel ATAMAN to Its Fleet 0 We received our International Marine Contractors Association Membership (IMCA) certificate. 0 IHI Marine Operation Works Contract Signed 0 TANAP Project Completed 0 Turkish Company Sinking the Largest Diameter HDPE Pipe 0 ARAS Adds New Offshore Operations Support Vessel Cengizhan to Its Fleet 0 Izmit Bay Crossing Bridge Project Completed 0 New Backhoe Dredger 0