Scroll Top
19th Ave New York, NY 95822, USA

Golden Horn Metro Crossing Bridge Project

Project Scope

Engineering and structural analysis.
Installation of HDPE water intake pipes, 10,000 m in length and Ø2,500 mm outer diameter.
Transportation by sea of steel decks and segments weighing between 50 and 300 tonnes (total 13,100 tonnes).

Contractor

Astaldi-Gülermak Adi Ortaklığı

Main Employer

Istanbul Municipality Railways System Department

Country

Türkiye

Year of Production

2011 – 2013