Project Scope
Engineering and structural analysis.
Installation of HDPE water intake pipes, 10,000 m in length and Ø2,500 mm outer diameter.
Transportation by sea of steel decks and segments weighing between 50 and 300 tonnes (total 13,100 tonnes).
Contractor
Astaldi-Gülermak Adi Ortaklığı
Main Employer
Istanbul Municipality Railways System Department
Country
Türkiye
Year of Production
2011 – 2013


