Project Scope
Underwater cable inspections were carried out in line with the Osmangazi Bridge constructed between Diliskelesi Peninsula in Gebze and Hersek Peninsula in Altınova.Total underwater inspection length is ~2700 metres.
Contractor
STFA
Main Employer
IHI Corporation
Country
Turkey
Year of Production
2012

