Reconstruction of Breakwater of Arzew Port

Project Scope

Placement of 0-500 kg Category Rock (7.200 tons)
Placement of 200-1.500 kg Category Rock (20.000 tons)
Placement of 1.5-4.5 ton Category Rock (27.000 tons)
Placement of 10 ton Weighted Precast Concrete Blocks (3.895 No’s)
Placement of 38.4 ton Weighted Tetrapods (760 No’s)
Placement of Cast-in-place Concrete (480 m3)

Contractor

D.T.P. Oran Algeria/Cosider TP

Main Employer

Algeria Ministry of Public Works

Country

Algeria

Year of Production

2005