Project Scope
Dredging of the fishing harbour used as a berthing pier and disposal of dredged material
Gravel bedding works at tower foundations using a fall pipe system (vertical pipe material casting system)
Levelling works at a depth of -45m using MUM (Modular and Multi-purpose Underwater Machine)
Erosion protection works
Underwater cutting works for guide piles at tower foundations
Contractor
DLSY JV (Daelim & Limak & SKEC & Yapı Merkezi)
Main Employer
Türkiye Cumhuriyeti Karayolları Genel Müdürlüğü
Country
Türkiye
Year of Production
2018


